A new planned Airbus A350 order has just been announced, and I find this to be a bit surprising.
Abra Group ordering five Airbus A350-900s
Abra Group has just signed a Memorandum of Understanding (MoU) for five Airbus A350-900s. A delivery timeline hasn’t yet been announced, and for that matter, the order hasn’t even been finalized. The planned order is described as being intended to further expand international long haul operations, and increase capacity.
For those not familiar, Abra Group is the parent company of both avianca and GOL, which are two of Latin America’s biggest airlines.
Here’s how Adrian Neuhauser, CEO of Abra Group, describes this order:
“We are delighted to announce this agreement with Airbus. We believe the arrival of these five A350s, which offer a best-in-class passenger experience, are more fuel efficient and have a lower cost per seat than competitor aircraft, will allow us to strengthen our commitment to make travel more accessible and responsible. This also means better prices for customers with better connectivity between our continent and Europe, and will further consolidate Abra as one of the largest and most competitive air transportation groups in Latin America. The aircraft selection is consistent with the strategic announcements we have done this year and further executes on our long term vision.”

Are these Airbus A350s intended for avianca or GOL?
Abra Group isn’t stating whether these planes are intended for avianca or GOL. As a reminder:
- avianca is primarily based in Colombia, and operates a fleet of roughly 125 aircraft, including Airbus A320-family aircraft, plus Boeing 787s
- GOL is based in Brazil, and operates a fleet of roughly 130 Boeing 737s
Now, personally I think it’s highly likely that these A350s are intended for avianca:
- avianca operates long haul flights, while GOL doesn’t (well, the airline tries to stretch the limits of the 737 MAX, but that’s about it); if GOL were to operate long haul flights, I can’t imagine it would make sense with such a small fleet
- The press release talks specifically about increasing capacity to Europe, which is primarily where avianca flies its wide body aircraft
- avianca had ordered A350s back in 2008; at the time, the airline ordered the A350-800, which is a variant that never ended up being produced
The Airbus A350 is a spectacular plane, and personally I prefer it to the Boeing 787. Given the size of avianca’s network between places like Bogota and Madrid, the airline should have no problems filling these aircraft.
But still, I’m a bit surprised by this order, as avianca currently has a fleet of 15 Boeing 787-8s. There are significant synergies from fleet commonality in terms of crew training, maintenance, scheduling, and more. If avianca wanted a higher capacity aircraft than the 787-8s, it could’ve gone with the 787-9 or 787-10.
Assuming this is all as I expect it is, I wonder what made avianca make the switch to Airbus jets for wide body aircraft. There’s no shortage of demand for the A350, so I can’t imagine avianca got some amazing deal. Or who knows, maybe it did.
It’s interesting to also remember that Brazil’s Azul recently decided to retire its Airbus A350s, even though they were just several years old. The airline argued it was just too big of a plane.

Bottom line
Abra Group is ordering five Airbus A350-900s, though hasn’t stated where the planes will be placed. This is the parent company of avianca and GOL, so I think it’s highly likely that these jets are headed to avianca. GOL doesn’t operate long haul flights, and the press release talks specifically about how these planes will be used to expand capacity to Europe.
I’m not sure I totally understand the choice of picking up A350s when avianca already has 787s, but I’m sure there’s a good reason.
What do you make of Abra Group ordering the A350? What do you think the plans are?
Membership is free and takes no more information than commenting as a guest. Earn status points for good contributions, and see fewer ads as your status grows.